Engineering geology
Geological research before construction, always relevant. There are several methods to resolve this problem.
The most common and traditional is shallow drilling notched samples of the soil and its further study. The main disadvantage of this method is time consuming and therefore more time and fees. The proposed methods allow you to perform geological surveys, drastically reducing the amount of exploration drilling, and in some cases, abandoning it!
• Short measurement time: 3.5 hours for a full treatment area of 2500 square meters. m ( in the case of research on the depth of 7 meters and about 5 hours , if required a large depth).
• As a result, significant savings of human and material resources.
• ” Continuous ” study – exclude the possibility of skipping abnormal areas , which often happens in conventional research drilling, when the areas are just between adjacent wells and then surprises.